Stockpile volume measurement

Stockpile volume measurement from the air.

When inventory closes, your team needs to know which pile was measured, what material it holds, and how much is on the ground. Moore Aerial Imaging uses drone imagery to estimate stockpile volumes in cubic yards for aggregate yards and earthwork contractors.

Volumes in cubic yardsPile IDs matched between flightsColorado Springs & the Front Range

Deliverables

What your yard team receives

Each measurement set is built to be read by the people who run the yard, and to be filed with the inventory period it belongs to.

  • A dated site map with pile IDs

    Site imagery from the flight, marked with each measured pile and the ID it carries, dated so the set lines up with the inventory period it belongs to.

  • A table of estimated cubic yards by pile

    Every measured pile listed with its estimated volume in cubic yards, keyed to the same pile IDs used on the map.

  • Material labels when the yard supplies them

    Where the yard tells us which material each pile holds, that label travels with the pile through the map and the table.

Repeat visits

Compare inventory between flights

When the same yard is flown again, the pile IDs carry across visits, so each pile can be matched to the pile it was on the previous flight. We flag the piles that moved, the piles that merged, and the piles that formed since that flight, and report the difference for each one against the previous measurement.

Inventory change on its own cannot tell deliveries from usage. A pile that grew may have been built up or simply not drawn down, and a pile that shrank may have been hauled out or consumed on site. The measurement reports the change; your own records explain it.

Reading the numbers

What affects a volume estimate

An aerial volume is a calculation over a surface, so a few site conditions shape the figure.

The assumed base beneath the pile

A pile sits on ground that is rarely flat. The base assumed under the pile changes the calculated volume, so it is stated with the estimate.

Adjoining piles

Piles that touch or run together are harder to separate cleanly, and the way the boundary between them is drawn affects each pile's figure.

Visible coverage

A pile partly hidden from the air is measured only where it can be seen, and the covered portion is not estimated from assumption.

Volumes are reported in cubic yards. Any tonnage conversion needs a material-specific bulk density, either supplied by you or accepted after review. These estimates support operational planning; certified quantities and licensed land surveying are outside this service.

Background

Who measures your yard

Chad Moore brings heavy civil, earthwork and construction QC experience to the work. That background is the context a stockpile inventory supports: material moving on and off site, grades changing, and quantities that have to hold up in a report.

Moore Aerial Imaging is based in Colorado Springs and serves Pueblo, Castle Rock and Denver.

Next step

Request a stockpile measurement quote

Send the city or yard address, the approximate number of piles, the deadline you are reporting against, and whether this is a one-time measurement or a recurring visit schedule.

    base44
    Edit with Base44